Friday, December 20, 2013

Roof frame up

Looks so much better with the roof frame on. Reduces the box shape a little bit


Thursday, December 19, 2013

Wow! The house looks enormous!! We definitely wanted to have a big house but I am astounded by the size of it. Too think we were concerned when we had to reduce the house length by a metre because the council knocked back our 6 meter setback request.

The builders left their ladder their so i took the opportunity to walk around the top floor, which of course I'm not supposed to but it was was too tempting.

As usual the fence was left unlocked (although shut over) but considering the builders drill was lying around amongst other things I'm really surprised its not locked up.





Tuesday, December 17, 2013

Frame going well

The first floor is pretty much complete and looks amazing! Wrapped with the high ceilings in the living areas and the 3 steps down which was forced upon us because of the slope of the block is actually something that we would have chosen even without the slope, Separates the living/kitchen area really nicely.

Hopefully 2nd story will start today




Friday, December 13, 2013

Ground Floor frame almost done

Frame is going up quickly and is looking good. No way the roof will be on before Christmas but hopefully if the weather is good the frame will get finished.

There seems to be a water pipe where our island bench should be and we are definitely not having a sink or any running water so not quite sure what thats all about but will wait and see. Everyone has told me the rooms look small when it is just the frame. They look pretty big too me so with any luck they might look even bigger once the plaster is done.

The steel and the amount of posi struts being used looks really solid, which is good.







Wednesday, December 11, 2013

Frame going up

Well by the looks of the site there is not much pre made off site so far. Not sure if that will change with the second story. One thing that we mentioned to the SS was the gates to the site being not only unlocked but left open often.  Once again last night one of the gates was wide open, so I shut it over, so at least it looked like it was locked up. Not sure if people would bother stealing wood or steel but surely you don't wont to risk it




Monday, December 9, 2013

Rain :(

Well the wood and steel got delivered nice and early on Monday but alas it rained consistently all day, so nothing got done. So much for summer. I was under the impression that the frames were all constructed off site and that's why they are so quick to put them up. Nothing that was delivered is pre-made however, so I presume that a lot of the work is being done onsite after all. I was also surprised at how much steel was delivered. Not that I am a building expert but it just makes you feel better about the strength of the house when you that much steel.

Nice weather today and supposedly for the rest of the week so hopefully we might see some progress soon




Friday, December 6, 2013

Helpful hint

I came across another blog that mentioned getting the slab cut out where the sliding doors sit so the tracking that the door slides on, is sunken in and is completely level with the floor. We requested this and it is surprisingly inexpensive to have done (approx $300 from memory) and will make the overall finish of the room look way better. One of those things that you wouldn't really think of and once the slab is done its too late.

You can see in the second picture of the post below the lip has been cut out for the stacker doors


Slab Done!

Well the slab is done and literally before the concrete had time to dry we recieved the invoice! Wow, they must have sent it the second the builders walked off the site.

I haven't taken too much notice of slabs in the past but ours looks great. Looks very neat and perfectly smooth on top.

Framing is supposed to start Monday. Crazy pace at the moment.

The builders doing our slab told my wife that carter grange use far more steel in their slabs than most builders and that it would be super strong. Nice to hear that we are getting the quality build we expected.




Wednesday, December 4, 2013

Slab preparation almost complete

I know it won't always be like this but it's amazing that every time I drive past, which is daily there seems to be something new happening.

Slab is supposed to be poured tomorrow, so hopefully the weather enables that to go ahead





Tuesday, December 3, 2013

Slab Prepearation

Looks like the slab is on schedule for Friday as the preparation is well underway. If the house looked small with just the site cut, it looks enormous with the boards up for where the slab will go. Amazing how your perception of the same space can change so dramatically.


Monday, December 2, 2013

Plumbing

The plumbers don't muck around. 30+ degree day and a bunch of guys working away. Seemed to get a huge amount done in the time they were there.